Professional Environmental Consulting Services
Savannah Environmental Services
Savannah Environmental Projects
Savannah Environmental provides a holistic environmental management service to public and private sector clients. Current clients include:
  • Eskom Holdings Limited Generation Division
  • Eskom Holdings Limited Transmission Division
  • Department of Water Affairs
  • Department of Environmental Affairs
  • African Clean Energy Developments
  • South African National Roads Agency Limited
  • East Rand Water Care Company
  • Renewable Energy Investments South Africa (Pty) Ltd
  • VentuSA Energy (Pty) Ltd
  • Just Energy
  • Thupela Energy
  • Rainmaker Energy Projects (Pty) Ltd
  • Moyeng Energy (Pty) Ltd
  • BioTherm Energy (Pty) Ltd
  • Windlab Developments South Africa (Pty) Ltd
  • Exxaro Resources Limited
  • Crenersol (Pty) Ltd
Current projects being undertaken by Savannah Environmental include Basic Assessments, Environmental Impact Assessments and environmental compliance monitoring. Documents for public review are available for download below.

In order to view or download the following documents Adobe Acrobat Reader is required.
Select the icon to the left to install the Adobe Acrobat Reader.


Kotulo Tsatsi PV 2 Facility Northern Cape Province DEA Ref No: 14/12/16/3/3/2/696 SolarReserve Kotulo Tsatsi Energy

SolarReserve Kotulo Tsatsi Energy proposes the development, construction and operation of a photovoltaic (PV) power plant with a generation capacity of up to 100MW located on a site near Kenhardt in the Northern Cape Province. 



Final EIA Report available for review
Kotulo Tsatsi PV2 Final EIA Report 9713.85 KB View
Appendix A1: Preliminary Layout Map 1016.4 KB View
Appendix A2: Preliminary Grid Connection Map 902.78 KB View
Appendix A3: Preliminary Sensitivity Map 528.27 KB View
Appendix A4: Optimised Sensitivity Map 569.31 KB View
Appendix A5: Optimised Grid Connection Map 899.22 KB View
Appendix A6: Final Layout Map 1026.17 KB View
Appendix A7 - Final Sensitivity Map 564.66 KB View
Appendix B - Authority Correspondence 4429.72 KB View
Appendix C1 - I&AP Database & Map 959.63 KB View
Appendix C2 - Site Notices and Newspaper Adverts 8154.18 KB View
Appendix C3 - Background Information Document 424.7 KB View
Appendix C4 - Organs of State Correspondence 4743.74 KB View
Appendix C5 - Stakeholder Correspondence 1400.63 KB View
Appendix C6 - Comments Received 2969.7 KB View
Appendix C7 - Minutes of Meetings 1789.1 KB View
Appendix C8 - Comments and Responses Report 965.21 KB View
Appendix D - Ecology Study 1812.3 KB View
Appendix E - Avifaunal Study 2499.38 KB View
Appendix F - Surface Water Resources Study 1693.08 KB View
Appendix G - Soil and Agricultural Potential Study 1055.02 KB View
Appendix H -Heritage Impact Assessment 1571.99 KB View
Appendix I - Palaeontological Study 3279.61 KB View
Appendix J -Visual Study 2265.22 KB View
Appendix K - Traffic Study 817.69 KB View
Appendix L - Social Impact Study 3097.9 KB View
Appendix L1 (a) - Social Report Peer Review Lettergement Programme 123.48 KB View
Appendix L1 (b) - Social Report Peer Review Letter 54.27 KB View
Appendix M - EMPr 2759.56 KB View
Appendix N - EIA Project Consulting Team CVs 1771.63 KB View
Appendix O -Project Information 121.9 KB View




Back to top of page


info@savannahsa.com




Site designed and hosted by
S2 Web Solutions