Savannah Environmental provides a holistic environmental management service to public and private sector clients. Current clients include:
  • Eskom Holdings Limited Generation Division
  • Eskom Holdings Limited Transmission Division
  • Department of Water Affairs
  • Department of Environmental Affairs
  • African Clean Energy Developments
  • South African National Roads Agency Limited
  • East Rand Water Care Company
  • Renewable Energy Investments South Africa (Pty) Ltd
  • VentuSA Energy (Pty) Ltd
  • Just Energy
  • Thupela Energy
  • Rainmaker Energy Projects (Pty) Ltd
  • Moyeng Energy (Pty) Ltd
  • BioTherm Energy (Pty) Ltd
  • Windlab Developments South Africa (Pty) Ltd
  • Exxaro Resources Limited
  • Crenersol (Pty) Ltd
Current projects being undertaken by Savannah Environmental include Basic Assessments, Environmental Impact Assessments and environmental compliance monitoring. Documents for public review are available for download below.

In order to view or download the following documents Adobe Acrobat Reader is required.
Select the icon to the left to install the Adobe Acrobat Reader.


Richards Bay Gas to Power Station KwaZulu-Natal Province DEA Ref: 14/12/16/3/3/2/867 Richards Bay Gas to Power 2 (Pty) Ltd

PROPOSED GAS TO POWER PLANT AND ASSOCIATED INFRASTRUCTURE ON A SITE WITHIN THE RICHARDS BAY INDUSTRIAL DEVELOPMENT ZONE, KWAZULU-NATAL PROVINCE

Project Name:  Proposed Gas to Power Station 

Applicant:  Richards Bay Gas to Power 2 (Pty) Ltd

Proposed Activity & Location:  The project entails the establishment of a gas to power plant (Combined Cycle Power Plant) and associated infrastructure, including a substation and 132kV power line to connect to the existing Eskom Indus Substation. The project will be located on Erven 17455, 17443 and 17442 within the Richards Bay Industrial Development Zone (IDZ) 1F, located in the uMthlathuze Local Municipality in Kwazulu-Natal, South Africa.  The gas to power plant will have a capacity of up to 300MW (gas generated energy) and an additional 100MW generated from the steam turbines. The project will be developed in two (2) phases to operate with a wide variety of fuels; including diesel and Liquefied Petroleum Gas (LPG) in Phase 1 and ultimately Liquid Natural Gas (LNG) or Natural Gas in Phase 2.

Environmental Impact Assessment Process In terms of Sections 24 and 24D of the National Environmental Management Act (Act No 107 of 1998), as read with Government Notices R982 to R985, a Scoping and EIA process is being undertaken in accordance with the EIA Regulations, 2014 for the proposed project.

The final EIA report has been submitted to the DEA.