Professional Environmental Consulting Services
Savannah Environmental Services
Savannah Environmental Projects
Savannah Environmental provides a holistic environmental management service to public and private sector clients. Current clients include:
  • Eskom Holdings Limited Generation Division
  • Eskom Holdings Limited Transmission Division
  • Department of Water Affairs
  • Department of Environmental Affairs
  • African Clean Energy Developments
  • South African National Roads Agency Limited
  • East Rand Water Care Company
  • Renewable Energy Investments South Africa (Pty) Ltd
  • VentuSA Energy (Pty) Ltd
  • Just Energy
  • Thupela Energy
  • Rainmaker Energy Projects (Pty) Ltd
  • Moyeng Energy (Pty) Ltd
  • BioTherm Energy (Pty) Ltd
  • Windlab Developments South Africa (Pty) Ltd
  • Exxaro Resources Limited
  • Crenersol (Pty) Ltd
Current projects being undertaken by Savannah Environmental include Basic Assessments, Environmental Impact Assessments and environmental compliance monitoring. Documents for public review are available for download below.

In order to view or download the following documents Adobe Acrobat Reader is required.
Select the icon to the left to install the Adobe Acrobat Reader.


Metals Industrial Cluster Near Kuruman, Northern Cape Province Ref No: NC/EIA/04/JTG/GA-S/KUR1/2016 Northern Cape Department of Economic Development and Tourism

METALS INDUSTRIAL CLUSTER AND ASSOCIATED INFRASTRUCTURE NEAR KURUMAN, NORTHERN CAPE PROVINCE

Project Name: Metals Industrial Cluster near Kuruman

Applicant: Northern Cape Department of Economic Development and Tourism

Location: Portion 6253 of Erf 1 located ~2km south east of the town of Kuruman and ~1km south west of Wrenchville.  

Proposed Activity:  The establishment of a Metals Industrial Cluster to provide a node for semi-industrial and industrial developments in the Kuruman area.  The Cluster is expected to be developed in four development phases and is expected to operate for a minimum of 20 years (first three phases).  Phase 4 is intended to cater for the expansion of the Cluster beyond the 20-year timeframe.  

Application for Environmental Authorisation:  In terms of Sections 24 and 24D of the National Environmental Management Act (No 107 of 1998), as read with Government Notice R982 - R985, a Scoping and EIA is required to be undertaken for the proposed project.  The competent authority for the proposed project is the Northern Cape Department of Environment and Nature Conservation.







Back to top of page


info@savannahsa.com




Site designed and hosted by
S2 Web Solutions