Professional Environmental Consulting Services
Savannah Environmental Services
Savannah Environmental Projects
Savannah Environmental provides a holistic environmental management service to public and private sector clients. Current clients include:
  • Eskom Holdings Limited Generation Division
  • Eskom Holdings Limited Transmission Division
  • Department of Water Affairs
  • Department of Environmental Affairs
  • African Clean Energy Developments
  • South African National Roads Agency Limited
  • East Rand Water Care Company
  • Renewable Energy Investments South Africa (Pty) Ltd
  • VentuSA Energy (Pty) Ltd
  • Just Energy
  • Thupela Energy
  • Rainmaker Energy Projects (Pty) Ltd
  • Moyeng Energy (Pty) Ltd
  • BioTherm Energy (Pty) Ltd
  • Windlab Developments South Africa (Pty) Ltd
  • Exxaro Resources Limited
  • Crenersol (Pty) Ltd
Current projects being undertaken by Savannah Environmental include Basic Assessments, Environmental Impact Assessments and environmental compliance monitoring. Documents for public review are available for download below.

In order to view or download the following documents Adobe Acrobat Reader is required.
Select the icon to the left to install the Adobe Acrobat Reader.


Noupoort CSP Project North West of Noupoort, Northern Cape Province CRESCO Energy (Pty)

150 MW NOUPOORT CONCENTRATED SOLAR POWER (CSP) PROJECT, NORTHERN CAPE PROVINCE

Project Name:  Noupoort Concentrated Solar Power (CSP) Project

Applicant:  CRESCO Energy (Pty) Ltd

Project Location: Remaining Extent of the Farm 207, Portion 1 and Portion 4 of the Farm Carolus Poort 167, approximately 4 km north west of Noupoort in the Umsobomvu Local Municipality (Pixley ka Seme District Municipality) in the Northern Cape Province. 

Proposed Activity:  The construction of a concentrated solar power (CSP) parabolic trough facility with a contracted capacity of up to 150 MW.  The development area for the project is approximately 430 ha in extent and will include the following infrastructure:

  • Parabolic trough plant, including an Energy Centre and Power Block.
  • Associated infrastructure: access roads, water supply pipeline, water storage tanks/reservoir, water treatment facility, lined evaporation ponds, plant assembly area, temporary laydown area, workshop and office buildings.  
  • On site substation and 132 kV overhead power line (to connect to the Eskom’s electricity grid).
  • Application for Environmental Authorisation: A Scoping and EIA process has been undertaken in terms of Sections 24 of the National Environmental Management Act (No 107 of 1998), as read with Government Notice R982 - R985.  The DEA accepted the Scoping Report and Plans of Study for the project in September 2016.  The application has been assigned the following reference number:  14/12/163/3/2/944.

 

Environmental Impact Assessment Report Available for Review:  

The EIA Report is available for review and comment from 05 December 2016 – 26 January 2017:   

• Hanover Public Library (Darling Street, Hanover) 

• Noupoort Public Library (Shaw Street, Noupoort) 

• for download on www.savannahsa.com/projects 

 

The due date for written comment is 26 January 2017.  

 

To obtain further information and register on the project database, please submit your name, contact information and interest in the project, in writing, to Savannah Environmental:

Gabriele Wood of Savannah Environmental 

Post: PO Box 148, Sunninghill, 2157 

Johannesburg

Tel: 011 656 3237

Fax: 086 684 0547

Email: gabriele@savannahsa.com

Website: www.savannahsa.com

 

 



Draft EIA Report
Draft EIA Main Report 8373.75 KB View
Appendix A - Consulting Team & Specialist CVs 3245.16 KB View
Appendix B - Authority Correspondence 6067.38 KB View
Appendix C1 - I&AP Database 445.3 KB View
Appendix C2 - Site NOtices and Newspaper Adverts 2094.01 KB View
Appendix C3 - Background Information Document 3053.2 KB View
Appendix C4 - Organs of State Correspondence 5105.1 KB View
Appendix C5 - Stakeholder Correspondence 1436.4 KB View
Appendix C6 - Comments Received 5861.1 KB View
Appendix C7 - Minutes of Meetings 1436.61 KB View
Appendix C8 - Comments and Responses Report 227.36 KB View
Appendix D - Ecology Impact Assessment Report 3639.98 KB View
Appendix E - Avifaunal Impact Assessment Report 22688.05 KB View
Appendix F - Surface Water and Hydrological Assessment Report 3394.12 KB View
Appendix G - Heritage Impact Assessment Report 1538.08 KB View
Appendix H - Palaeontological Impact Assessment Report 3606.18 KB View
Appendix I - Soil and Agricultural Potential Report 619.25 KB View
Appendix J - Visual Impact Assessment Report 12287.17 KB View
Appendix K - Social Impact Assessment Report 4308.89 KB View
Appendix K1 - Social Study Review Letter 166.03 KB View
Appendix L - Traffic Assessment 985.37 KB View
Appendix M1 - Proof of Water Availability 643.97 KB View
Appendix M2 - Letter confirming future use of projects 39.81 KB View
Appendix M3 - Preliminary Geotechnical Report 7222.53 KB View
Appendix M4 - Letter from Noise Specialist 1527 KB View
Appendix M5 - Letter from Municipality regarding Waste 401.49 KB View
Appendix N - EMPr 9515.04 KB View
Appendix O - EAP Affirmation and Declaration 959.04 KB View
Appendix P - Specialist Declarations 2808.71 KB View
Appendix Q - A3 Maps and Site Coordinates 2460.53 KB View




Back to top of page


info@savannahsa.com




Site designed and hosted by
S2 Web Solutions