Professional Environmental Consulting Services
Savannah Environmental Services
Savannah Environmental Projects
Savannah Environmental provides a holistic environmental management service to public and private sector clients. Current clients include:
  • Eskom Holdings Limited Generation Division
  • Eskom Holdings Limited Transmission Division
  • Department of Water Affairs
  • Department of Environmental Affairs
  • African Clean Energy Developments
  • South African National Roads Agency Limited
  • East Rand Water Care Company
  • Renewable Energy Investments South Africa (Pty) Ltd
  • VentuSA Energy (Pty) Ltd
  • Just Energy
  • Thupela Energy
  • Rainmaker Energy Projects (Pty) Ltd
  • Moyeng Energy (Pty) Ltd
  • BioTherm Energy (Pty) Ltd
  • Windlab Developments South Africa (Pty) Ltd
  • Exxaro Resources Limited
  • Crenersol (Pty) Ltd
Current projects being undertaken by Savannah Environmental include Basic Assessments, Environmental Impact Assessments and environmental compliance monitoring. Documents for public review are available for download below.

In order to view or download the following documents Adobe Acrobat Reader is required.
Select the icon to the left to install the Adobe Acrobat Reader.


Suurplaat Wind Energy Facility and Associated Infrustructure Western And Northern Cape Provinces DEA REF: 12/12/20/1583 Moyeng Energy (Pty) Ltd

Project Name: Suurplaat Wind Energy Facility and Associated Infrastructure 

Applicant: Moyeng Energy (Pty) Ltd

Proposed Amendments: Moyeng Energy (Pty) Ltd obtained Environmental Authorisation (EA) for the Suurplaat Wind Energy Facility and associated infrastructure in April 2011.  The three phases of the wind energy facility, the transmissions lines and substations were assessed separately in the final EIA Report (Savannah Environmental, 2010), however a single EIA process was followed and a single EA received for the entire facility and electrical infrastructure.  Moyeng Energy has requested the split of the project into three separate phases and that the grid infrastructure also be split from the wind energy facility.  The purpose of this request is as follows:

1. Eskom requires that the EA and Environmental Management Programme (EMPr) for Eskom’s part of the works (i.e. all grid connection infrastructure) will be transferred to Eskom’s name following completion of construction.

2. Each phase of the project will ultimately be managed by a separate Special Purpose Vehicle (SPV).  Therefore, four separate authorisations are required, i.e. one EA for each of the three phases of the wind energy facility and a separate EA for the grid connection.  Each of these EAs should include authorisation for the relevant associated infrastructure.  

In addition, following developments in technology after the issuing of the EA and in finalising the site development plan on the basis of the wind monitoring results from the site and economic feasibility considerations, the developer is now proposing to increase the maximum turbine hub height from 100m to 120m and increase the maximum rotor diameter from 90m to 132m.  A reduction in extent of the facility footprint is proposed in that the number of turbines is proposed to be reduced from 400 to 187.  The number of on-site substations will also be reduced from 13 to 04.  

An application has been submitted to the Department of Environmental Affairs (DEA), as the competent authority.  The DEA has advised that this application is considered to be a Part 2 Amendment as contemplated in terms of Regulation 31 of the EIA Regulations, 2014.

In terms of Chapter 6 of the EIA Regulations 2014, opportunity is being provided to the public to provide comment on the proposed amendments.  A separate amendment motivation report and Split EIA reports have been prepared and are available for a 30-day review period from 21 November 2016 to 12 January 2017.  Please submit comment no later than 12 January 2017.  The 30-day review period excludes the days of reckoning from 15 December 2016 – 05 January 2017 as per Regulation 3(2) of the EIA Regulations, 2014.  The report is available for download on www.savannahsa.com/projects or on request from Savannah Environmental.

Interested and affected parties can request further information via email or telephone correspondence from the contact person below. Comments can be submitted in writing via post or email to the contact person below

Gabriele Wood

PO Box 148, Sunninghill, 2157

Phone: 011 656 3237

Fax: 086 680 0547

E-mail: gabriele@savannahsa.com

 



Motivation for Amendment of EA
Motivation For Amendment to Authorisation 795.39 KB View
Appendix A - Noise 202.11 KB View
Appendix B - Visual Impact Assessment 2514.92 KB View
Appendix C - Bats 970.59 KB View
Appendix D - Birds 454.26 KB View
Appendix E1 - I&AP Database 42.33 KB View
Appendix E2 - Notification Letter and Proof 565.83 KB View
Appendix E3 - Adverts 2465.44 KB View
Appendix E4 - Proof of Site Notices 792.46 KB View
Appendix E5 - Comments Received 1323.29 KB View
Appendix E6 - C&R Report 198.03 KB View
Split Report
Split EIA Report 1 (Suurplaat) 7153.52 KB View
Split EIA Report 2 (Gemini) 7137.92 KB View
Split EIA Report 3 (Klipfontein) 7286.97 KB View
Split EIA Report 4 (Grid) 5921.23 KB View
Appendix A - Moyeng Energy Letter of Motivation for Site Selection 323.85 KB View
Appendix B - EIA project team CVs 218.76 KB View
Appendix C - Authority Consultation 350.86 KB View
Appendix D - Database 80.74 KB View
Appendix E - Adverts and Notifications 7008.93 KB View
Appendix F - Public Participation Information Information 5149.97 KB View
Appendix G - Ecology Study 2652.01 KB View
Appendix H - Avifauna Study 2039.02 KB View
Appendix I - Geological and Erosion Potential Study 1323.95 KB View
Appendix J - Visual Impact Assessment 3440.81 KB View
Appendix K - Heritage Impact Assessment 2121.8 KB View
Appendix L - Noise Impact Assessment 7130.58 KB View
Appendix M - Social Impact Assessment 2597.05 KB View
Appendix N (EMPr) - Suurplaat Phase 7153.52 KB View
Appendix N (EMPr) - Gemini Phase 916.06 KB View
Appendix N (EMPr) - Klipfontein Phase 937.28 KB View
Appendix N (EMPr) - Grid 751.44 KB View
Appendix O - Paleontology Study 1848.05 KB View
Appendix P1 - I&AP Database 42.33 KB View
Appendix P2 - Notification Letter and Proof 565.83 KB View
Appendix P3 - Adverts 2465.44 KB View
Appendix P4 - Proof of Site Notices 792.46 KB View
Appendix P5 - Comments Received 1323.29 KB View
Appendix P6 - C&RR 197.97 KB View
Appendix Q - Bird monitoring report 4427.1 KB View
Appendix R - Bat monitoring report 6116.5 KB View




Back to top of page


info@savannahsa.com




Site designed and hosted by
S2 Web Solutions