Professional Environmental Consulting Services
Savannah Environmental Services
Savannah Environmental Projects
Savannah Environmental provides a holistic environmental management service to public and private sector clients. Current clients include:
  • Eskom Holdings Limited Generation Division
  • Eskom Holdings Limited Transmission Division
  • Department of Water Affairs
  • Department of Environmental Affairs
  • African Clean Energy Developments
  • South African National Roads Agency Limited
  • East Rand Water Care Company
  • Renewable Energy Investments South Africa (Pty) Ltd
  • VentuSA Energy (Pty) Ltd
  • Just Energy
  • Thupela Energy
  • Rainmaker Energy Projects (Pty) Ltd
  • Moyeng Energy (Pty) Ltd
  • BioTherm Energy (Pty) Ltd
  • Windlab Developments South Africa (Pty) Ltd
  • Exxaro Resources Limited
  • Crenersol (Pty) Ltd
Current projects being undertaken by Savannah Environmental include Basic Assessments, Environmental Impact Assessments and environmental compliance monitoring. Documents for public review are available for download below.

In order to view or download the following documents Adobe Acrobat Reader is required.
Select the icon to the left to install the Adobe Acrobat Reader.


Neopack CHP Plant Rosslyn, Gauteng Province Neopack (Pty) Ltd

Project Name: Neopak CHP Plant, Rosslyn, Gauteng

Applicant: Neopak (Pty) Ltd

Proposed Activity:  The development of a Combined Heat and Power (CHP) gas turbine plant at the existing Neopak Facility in Rosslyn, Gauteng.  The CHP Plant will generate steam and electricity for the Neopak Facility operations. 

Location:  At the existing operational Neopak Facility located on Portion 3 of Erf 39, Portion 1 of Erf, 41 and Erf 40 (514 Hendrik van Eck Street, Rosslyn).  

Basic Assessment Process:  In terms of sections 24 and 24D of NEMA, as read with the EIA Regulations 2014 of GNR982, GNR983; GNR984; and GNR985, a Basic Assessment process is required to obtain Environmental Authorisation for the proposed project.  An application for Environmental Authorisation for the CHP Plant has been lodged with the National Department of Environmental Affairs (DEA), as the competent authority.  Savannah Environmental is undertaking the required environmental impact assessment and public participation process.  

Basic Assessment Report available for Review:  The Basic Assessment Report is available for review and comment.  The report is available at the Neopak Facility Reception (514 Hendrick van Eck Street, Rosslyn) from 28 February 2017 – 31 March 2017.  The report is also available for download on www.savannahsa.com/projects.  The due date for written comment is 31 March 2017.

 

To obtain further information and register on the project database, please submit your name, contact information and interest in the project to:

Gabriele Wood of Savannah Environmental 

Post: P.O. Box 148, Sunninghill, 2157 , Johannesburg

Tel: 011 656 3237  |  Fax: 086 684 0547

Email: gabriele@savannahsa.com

Website: www.savannahsa.com

 



Draft Basic Assessment Report
Draft Basic Assessment Report - Feb 2017 1514.21 KB View
Appendix A1 - Locality Map 1107.47 KB View
Appendix A2 - Layout Map 735.26 KB View
Appendix A3 - Sensitivity Map 1944.62 KB View
Appendix A4 - Sensitivity Map Boarder Area 1482.21 KB View
Appendix B - Site Photographs 259.32 KB View
Appendix C - Facility Illustration 882.07 KB View
Appendix D1 - Atmospheric Impact Report 1232.76 KB View
Appendix E1 - Site Notices & Newspaper Adverts 1473.81 KB View
Appendix E2 - Proof of Stakeholder Correspondence 744.53 KB View
Appendix E3 - Authority Consultation 373.01 KB View
Appendix E4 - I&AP Database 70.62 KB View
Appendix E5 - Comments Recieved 17.81 KB View
Appendix E6 - Comments & Responses Report 17.81 KB View
Appendix F - Impact Assessment 401.83 KB View
Appendix G - EMPr 1932.13 KB View
Appendix H - EAP Declaration, Affirmation and CVs 1195.55 KB View
Appendix I - Specialist Declaration 126.46 KB View




Back to top of page


info@savannahsa.com




Site designed and hosted by
S2 Web Solutions