Eastern Cape Cluster of Renewable Energy Facilities

THE SOLARIS FIELDS AND SUN GARDEN SOLAR PHOTOVOLTAIC FACILITIES, EASTERN CAPE PROVINCE

Project Names:  Solaris Fields Solar Photovoltaic and Sun Gardens Solar Photovoltaic, Eastern Cape Province

Applicant: Solaris Fields (Pty) Ltd and Sun Gardens (Pty) Ltd

Proposed Activities: The development of two (2) separate Solar Photovoltaic (PV) facilities and associated infrastructure are being proposed for power generation purposes. The connection points into the national grid will be the existing Poseidon-Grassridge No.2 400kV power line and the existing Poseidon–Dedisa No.1 400kV power line. Associated infrastructure for each of the solar PV includes an on-site switching station, collector substation, a 132kV power line (twin turn dual circuit), access roads (gravel in nature), concrete foundations and hardstands, laydown area, cabling to be laid underground where practical, temporary concrete batching plant, temporary staff accommodation, and operation and maintenance buildings. Details of each solar PV are provided below.

 

Project Capacity No. of Panels Dimensions and Technology
Solaris Fields Solar PV 400MW Up to 750 000 Height: ~2m from ground level (installed)
Bifacial tracking PV technology
Sun Gardens Solar PV 400MW Up to 750 000 Height: ~2m from ground level (installed)
Bifacial tracking PV technology

Location: Located between Somerset East and Makhanda, ~36km south of Cookhouse, within the Blue Crane Route Local Municipality, Sarah Baartman District Municipality in the Eastern Cape Province, and within the Cookhouse Renewable Energy Development Zone (REDZ). The affected properties include:

 

 

Solaris Fields Solar PV Sun Gardens Solar PV
Portion 9 of the farm Britzkraal No 253, Division of Somerset East Portion 9 of the farm Britzkraal No 253, Division of Somerset East
Portion 8 (a Portion of Portion 7) of the farm Britzkraal No 253, Division of Somerset East Portion 8 (a Portion of Portion 7) of the farm Britzkraal No 253, Division of Somerset East
Portion 7 of the farm Britzkraal No 253, Division of Somerset East Portion 7 of the farm Britzkraal No 253, Division of Somerset East
Portion 1 of farm Bothas Hoop 358, Division of Somerset East Portion 1 of farm Bothas Hoop 358, Division of Somerset East

Basic Assessment Process: In terms of Sections 24 and 24D of the National Environmental Management Act (No 107 of 1998), as read with Government Notice R324 – R327, as amended, Environmental Authorisation is required for the projects. As the project sites are located within a REDZ and the Eastern Strategic Transmission Corridor, Basic Assessment (BA) processes are required to be undertaken in accordance with GN R.113 and GN R.114 (February 2018). Savannah Environmental is undertaking the required environmental assessments and a combined public participation process.

Basic Assessment Reports available for review: The Basic Assessment (BA) Reports for Solaris Fields Solar PV and Sun Gardens Solar PV are available for review and comment from Friday,12 November 2021 until Monday, 13 December 2021., and the due date for written comments on these reports is Monday, 13 December 2021. Please see contact details below for submission of written comments.

Nicolene Venter of Savannah Environmental

P.O. Box 148, Sunninghill, 2157

Mobile: 060 978 8396

Tel: 011 656 3237

Fax: 086 684 0547

Email: publicprocess@savannahsa.com

Website: www.savannahsa.com

Documents for public review are available for download.

If you have already registered you interest click on “View Downloads”.

If you have not registered your interest click on “Register Interest”, fill in and submit the form.

Contact Savannah Environmental

If you would like further details, please do not hesitate to contact any member of
our Environmental team at +27 (0)11 656 3237 / +27 (0)11 656 3256