Kiara PV Cluster & Associated Infrastructure

KIARA PHOTOVOLTAIC CLUSTER AND ASSOCIATED INFRASTRUCTURE, NORTH WEST PROVINCE

 

Applicant: Voltalia South Africa (Pty) Ltd

Proposed Activity and Location: The development of seven (7) photovoltaic (PV) facilities and associated infrastructure on sites located approximately 16km north-east of the town of Lichtenburg in the North West Province. The projects are located in the Ditsobotla Local Municipality within the Ngaka Modiri Molema District Municipality.

Project Name Capacity Affected Property
Kiara PV 1 Facility 120MW Portion 2 of the Farm Hollaagte No. 8
Kiara PV 2 Facility 120MW Portion 2 of the Farm Hollaagte No. 8
Kiara PV 3 Facility 120MW Portion 2 of the Farm Hollaagte No. 8
Kiara PV 4 Facility 120MW Portion 2 of the Farm Hollaagte No. 8
Kiara PV 5 Facility 130MW Remaining extent of the Farm Hollaagte No. 8
Kiara PV 6 Facility 130MW Portion 2 of the Farm Hollaagte No. 8
Kiara PV 7 Facility 130MW Remaining extent of the Farm Hollaagte No. 8

The following infrastructure will be developed for each of the respective PV facilities:

  • Solar PV array comprising PV modules and mounting structures
  • Inverters and transformers
  • Cabling between the panels
  • 132kV onsite facility substation
  • Cabling from the onsite substation to a collector substation (either underground or overhead).
  • Electrical and auxiliary equipment required at the collector substation that serves the solar energy facility, including switchyard/bay, control building, fences, etc.
  • Battery Energy Storage System (BESS)
  • Site and internal access roads (up to 8m wide)
  • Site offices and maintenance buildings, including workshop areas for maintenance and storage.
  • Temporary and permanent laydown area

Application for Environmental Authorisation: Separate applications for Environmental Authorisation (EA) in terms of the National Environmental Management Act (No. 107 of 1998) and the Environmental Assessment Regulations, 2014, as amended, (GNR 326) have been submitted for the projects to the Department of Forestry, Fishery and the Environment (DFFE).

Environmental Impact Assessment Report available for public review and comment: EIA Reports in support of the Application for Environmental Authorisations have been compiled and are available for review and comment from Friday, 20 January 2023 to Monday, 20 February 2023 on our online stakeholder engagement platform at https://savannahsa.com/public-documents/energy-generation/. To obtain further information and register on the project database, please submit your name, contact information and interest in the project to:

Bregardia Rabbie of Savannah Environmental
Post: P.O. Box 148, Sunninghill, 2157, Johannesburg
Tel: 011 656 3237 / Fax: 086 684 0547
Mobile: 060 978 8396
Email: publicprocess@savannahsa.com
Website: www.savannahsa.com

Documents for public review are available for download.

Please fill the form below to access the project’s documents





I confirm that I would like to register my interest in the above project.

Contact Savannah Environmental

If you would like further details, please do not hesitate to contact any member of
our Environmental team at +27 (0)11 656 3237 / +27 (0)11 656 3256

Menu