Olifantshoek 132kV Power Line, Northern Cape Province
Project Name: Olifantshoek 132kV Power Line, Northern Cape Province
Applicant: Gamagara Local Municipality
Proposed Activity: The construction and operation of grid connection infrastructure consisting of a single circuit 132kV power line between the existing Emil Traction Substation and the authorised Olifantshoek Substation. The proposed power line will be used to strengthen the grid network in the area in order to ensure adequate supply of electricity for residents within the municipality’s jurisdictional area. The power line is being assessed within a 300m wide and 36km long grid connection corridor.
Project Location: Near the town of Olifantshoek located within the Gamagara Local Municipality and the greater John Taolo Gaetsewe District Municipality the in the Northern Cape Province. The affected properties are:
Remaining Extent of the Farm Fritz 540 | Portion 1 of the Farm Gamagara 541 |
Portion 1 of the Farm Fritz 540 | Portion 7 of the Farm Gamagara 541 |
Portion 2 of the Farm Fritz 540 | Portion 2 of the Farm Dingle 565 |
Portion 4 of the Farm Fritz 540 | Remaining Extent of the Farm Dingle 565 |
Portion 5 of the Farm Fritz 540 | Remaining Extent of the Farm Smythe 566 |
Portion 8 of the Farm Fritz 540 | Portion 1 of the Farm Wright 538 |
Portion 9 of the Farm Fritz 540 | Remaining Extent of the Farm Murray 570 |
Portion 10 of the Farm Fritz 540 | Portion 2 of the Farm Murray 570 |
Remaining Extent of the Farm Gamagara 541 | Remaining Extent of the Farm Cox 571 |
Portion 4 of the Farm Cox 571 | Portion 1 of the Farm Cox 571 |
Remaining Extent of the Farm Hartley 573 | Portion 3 of the Farm Cox 571 |
Portion 3 of the Farm Hartley 573 | Remaining Extent of the Farm Diegaart’s Heuwel 765 |
Remaining Extent of the Farm Neylan 574 | Portion 1 of the Farm Neylan 574 |
Remaining Extent of the Farm Neylan 766 | Portion 3 of the Farm Neylan 766 |
Portion 4 of the Farm Neylan 766 | Portion 7 of the Farm Neylan 766 |
Remaining Extent of the Farm Erf 155 Olifantshoek |
Basic Assessment Process: In terms of Sections 24 and 24D of the National Environmental Management Act, 1998 (Act No. 107 of 1998), as read with Government Notice R324 – R327, as amended (2017), a Basic Assessment (BA) is required to be undertaken in support of an application for Authorisation. Savannah Environmental (Pty) Ltd is undertaking the required BA and public participation process for the project.
To obtain further information and register on the project database, please submit your name, contact information and interest in the project to:
|
February 2020
Documents for public review are available for download.
If you have already registered you interest click on “View Downloads”.
If you have not registered your interest click on “Register Interest”, fill in and submit the form.
Contact Savannah Environmental
If you would like further details, please do not hesitate to contact any member of
our Environmental team at +27 (0)11 656 3237 / +27 (0)11 656 3256