PROPOSED SADAWA SUITE PHOTOVOLTAIC SOLAR ENERGY FACILITIES, BATTERY ENERGY STORAGE SYSTEMS, COLLECTOR SUBSTATION AND ASSOCIATED ELECTRICAL GRID INFRASTRUCTURE (EGI) NEAR CERES, WESTERN CAPE PROVINCE
Applicant: South Africa Mainstream Renewable Power Developments (Pty) Ltd.
Proposed Activity: Establishment four (4) Photovoltaic (PV) Solar Energy facilities (SEF), Battery Energy Storage Systems (BESS), Collector Substation and associated Electrical Grid Infrastructure (EGI) connecting the facilities to the national grid at the existing Eskom 765kV Kappa Substation. Infrastructure associated with the projects will include:
Solar Energy Facility | Electrical Grid Connections | Collector Substation |
|
|
|
Project Location: Approximately 65km north-east of Ceres along the R365, within the Witzenberg Local Municipality, Cape Winelands District Municipality, Western Cape Province.
SADAWA SUITE | |||
Sadawa PV Suite (four (4) distinct PV SEF Developments) | Sadawa Grid Suite (four (4) distinct EGI Connection developments) | ||
Projects (100MW respectively) | Property/ies | Projects (132kV respectively) | Property/ies |
Waboom PV SEF |
|
Waboom EGI |
|
Sadawa PV SEF | Sadawa EGI | ||
Misgunst PV SEF | Misgunst EGI | ||
Breede PV SEF | Breede EGI | ||
Collector EGI (including a substation and powerlines) | |||
Sadawa Collector EGI (33kV/132kV) |
|
Basic Assessment Processes: In terms of Sections 24 and 24D of the National Environmental Management Act (No 107 of 1998), as read with Government Notice R324 – R327, as amended, and GN R114 (February 2018), a Basic Assessment is required for each project associated with the Sadawa Suite. Savannah Environmental is undertaking the required basic assessment and public participation processes for these projects.
Extension of review and comment period for Basic Assessment Reports: The review and comment period for the BA Reports has been extended with an additional 30-days and will now end on Monday, 20 September 2021. The final date to submit comments is, Monday, 20 September 2021.
Please note: Specialist studies for the PVs and EGIs for each suite are combined as neccesary, as per the agreement made during the pre-application meeting held with the Competent Authority. Please refer to the combined appendices download button below to obtain the appendices that are common to all the applications.
To obtain further information and register on the project database, please submit your name, contact information and interest in the project to the contact person below:
Nicolene Venter of Savannah Environmental
Post: PO Box 148, Sunninghill, 2157
Johannesburg
Tel: 011 656 3237
Fax: 086 684 0547
Email: publicprocess@savannahsa.com
Website: www.savannahsa.com
Documents for public review are available for download.
Please click publicprocess@savannahsa.com to access the document.
Contact Savannah Environmental
If you would like further details, please do not hesitate to contact any member of
our Environmental team at +27 (0)11 656 3237 / +27 (0)11 656 3256