Public Documents
Access project reports made available for public review and comment as part of our regulated processes.
Amendment Process
Richards Bay Gas Power 2 (Pty) Ltd (the Applicant) has requested an amendment to the existing Environmental Authorisation (EA) for the authorised development of the 400MW Richards Bay Gas to Power Facility, located within Zone 1F of the Richards Bay Industrial Development Zone (IDZ) in Richards Bay, KwaZulu-Natal Province. An amendment application, final EMPr and Layout approval processes is being undertaken. Revised Motivation Report is available for a 30-day review. Review period: 23 October 2026 to 24 November 2026. Register your interest to become involved in the amendment process. Bhalisa usho isasasa lakho ukuze ube yingxenye yale nqubo. Registreer u belangstelling om by die wysigingsproses betrokke te raak.
Scoping & EIA
Banken Wind Energy Facility 1 (Pty) Ltd proposes development of a wind energy facility and associated infrastructure ~25km south of Aggeneys in the Northern Cape Province. The wind farm is to be known as the Banken Wind Energy Facility 1. The Final Scoping Report has been submitted to the DFFE.
Scoping & EIA
Eden Renewables South Africa (Pty) Ltd proposes to establish the Bloukrans Solar PV Project comprising two co-located solar photovoltaic (PV) facilities (Bloukrans Solar PV1 and Bloukrans Solar PV2) with a total generating capacity of up to 475MW (~237MW each), and a co-located Battery Energy Storage System (BESS) of up to 200MWh, to supply renewable energy to the national grid. Revised EIA Report is available for a 30-day review. Review period: 14 September 2026 to 14 October 2026. Register your interest to become involved in the process. Bhalisa usho isasasa lakho ukuze ube yingxenye yale nqubo. Registreer u belangstelling om by die proses betrokke te raak.
Amendment Process
Calodex (Pty) Ltd has requested an amendment for the authorised development of the 115MWMW Calodex Solar Photovoltaic (PV) Facility on a site approximately 5km north of Springs in the Gauteng Province. An amendment application, final EMPr and Layout approval processes is being undertaken. The Final Motivation Report submitted for decision-making.
Basic Assessment
Crassula Solar PV (RF) (Pty) Ltd proposes the construction and operation of the Crassula Grid Connection Infrastructure to support the connection of the authorised Crassula Solar PV Facility to the national grid at the existing Eskom Gamma Main Transmission Substation (MTS). The grid connection infrastructure is proposed between the Crassula Solar PV Facility and the Gamma MTS, located approximately 12km south-east of the PV site.
Scoping & EIA
JUWI Renewable Energies (Pty) Ltd proposes the development of the Elangeni Solar Photovoltaic (PV) and electricity grid infrastructure (EGI) Project and associated infrastructure with an installed capacity of up to ~130MWp and a contracted capacity of up to ~100MWac, including a Battery Energy Storage System (BESS) and associated grid connection infrastructure.
Scoping & EIA
The development of a solar PV cluster comprising four separate solar photovoltaic (PV) facilities and associated infrastructure, with a total generating capacity of up to 900MW. The details and development areas for the 4 solar PV facilities include: • Ga-Machacha Solar PV 1: Capacity of 240MW with a development area up to 301ha (Portion 0 of the Farm Scheepersrust 771 KS) • Ga-Machacha Solar PV 2: Capacity of 240MW with a development area up to 325ha (Portion 0 of the Farm Scheepersrust 771 KS) • Ga-Machacha Solar PV 3: Capacity of 240MW with a development area up to 320ha (Portion 0 of the Farm Scheepersrust 771 KS) • Ga-Machacha Solar PV 4: Capacity of 180MW with a development area up to 223ha (Portion 0 of the Farm Scheepersrust 771 KS) EIA Report is available for 30-day review. Review period: 25 September 2026 to 26 October 2026. Register your interest to become involved in the process. Ngwadiša kgahlego ya gago ya go kgatha tema ka tshepedišong.
Scoping and EIA
Gourikwa Route Power Development (Pty) Ltd proposes the development of a combined-cycle gas turbine (CCGT) power plant of up to 3 000 MW, together with associated electrical grid connection infrastructure, gas receiving and auxiliary fuel infrastructure, water supply infrastructure, and associated ancillary infrastructure. It is proposed that the facility will utilise indigenous natural gas sourced from Block 11B/12B, southwest of Mossel Bay, or an alternative gas and/or other fuel source/s, and/or fuel stored on site in storage tanks. **Notice: postponement of the review period and public open day** Gourikwa Route Power Development (Pty) Ltd, together with Savannah Environmental, wishes to advise that the 30-day review and comment period for the Scoping Report for the proposed Garden Route Gas to Power Project and associated infrastructure, Mossel Bay, Western Cape Province, has been unavoidably postponed pending the finalisation of outstanding project information required to support the Scoping and EIA process. Live Read Radio notices issued on 18 September 2026, and newspaper adverts published on 25 September 2026, indicated that the Scoping Report would be available for review and comment from Monday, 28 September 2026. The report will not be made available for that review and comment period. The public open day scheduled for Tuesday, 13 October 2026, 15:00–19:00, at D’Almeida Community Hall, Mossel Bay, is postponed. A new date for the release of the Scoping Report, and a new date for the public open day, will be announced through the same notification methods, including direct notification to registered Interested and Affected Parties. Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak. Bhalisa usho isasasa lakho ukuze ube yingxenye yale nqubo.
Scoping & EIA
JN Venter Beleggings proposes the Hardrock Citrus Agricultural Development, covering approximately 852 ha on Farm 715 and the Remainder of Portion 2 of Farm Blouw Baadjies Vley 189, Division Uitenhage. A Background Information Document (BID) is available for a 30-day review. Review period: 05 November 2026 to 07 December 2026 Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak.
S24G Application
Impact for Christ Ministries is applying under Section 24G of NEMA for rectification of unlawful activities on Portion 35 of the Farm Tweefontein 523 JQ, located within the Cradle of Humankind World Heritage Site. The Final Report has been submitted to the Gauteng Department of Agriculture and Rural Development (GDARD). Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak. Ngwadiša kgahlego ya gago ya go kgatha tema ka tshepedišong.
Basic Assessment
Kalgold Solar PV (Pty) Ltd, together with Harmony Gold Mining Company Limited (Harmony Gold) is looking to supplement the Harmony Kalgold Mine operations (the Mine) energy supply by implementing solar PV generation technology at their site, aiding their transition to a more sustainable and environmentally friendly energy mix. The development of the Kalgold Solar PV facility with a generating capacity of up to 19.5MW is proposed east of the Harmony Kalgold operations The Basic Assessment Report has been updated, as applicable, and submitted to the North West Department of Economic Development, Environment, Conservation and Tourism for decision-making.
Scoping & EIA
South Deep Joint Venture proposes to expand the existing Khanyisa Solar PV facility by an additional 30MW. This expansion will increase the total generation capacity up to 80MW. To support the additional capacity, the project will utilise electrical grid infrastructure that will connect the expanded facility to the Twin Shaft Substation by looping into the existing 11 kV underground transmission line situated approximately 250m east of the operational solar plant. The 30-day review and comment period is from Tuesday, 3 November 2026 to Friday, 4 December 2026. The final day to submit comments is Friday, 4 December 2026.
Scoping and Environmental Impact Assessment
The development of the Kraalkop solar PV facility with a generating capacity of up to 100MW, comprising a solar photovoltaic (PV) facility and associated infrastructure is planned by Mponeng Solar PV (Pty) Ltd. The planned Kraalkop Solar PV Facility is located on Remaining Extent of Portion 5 (a Portion of Portion 2), Portion 12 (a Portion of Portion 2), Portion 17 (a Portion of Portion 2), Portion 2, Portion 21, Portion 23, Portion 29 and Portion 30 of the Farm Bandsfontein 115 IQ, located approximately 6km southeast of Carletonville and 7km north of Fochville, within the Merafong City Local Municipality and the West Rand District Municipality, Gauteng.
Amendment of EMPr
ABO Wind Lichtenburg 3 PV (Pty) Ltd propose to amend the approved Environmental Management Programmes (EMPrs) for the operational Lichtenburg 1, 2 and 3 PV Solar Facilities (DFFE Refs: 14/12/16/3/3//1093, issued July 2019) to allow herbicide use as an alternative for effective vegetation control during construction and/or operational phases. This supports ongoing maintenance, fire risk management, and site safety while the facilities remain operational. Amended EMPrs is available for a 30-day review. Review period: 15 June 2026 to 16 July 2026. Register your interest to become involved in the process. Bhalisa usho isasasa lakho ukuze ube yingxenye yale nqubo. Registreer u belangstelling om by die proses betrokke te raak.
Scoping & EIA
Matseng Solar PV (RF) (Pty) Ltd proposes the development of a solar PV cluster with a total generating capacity of approximately 1920MW, comprising two separate solar photovoltaic (PV) facilities and associated infrastructure. Scoping Reports are available for a 30-day review Review period: 03 November 2026 to 04 December 2026 Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak. Kwadisa kgatlhegelo ya gago gore o nne le seabe mo tiragalong e.
Scoping & EIA
Morokweni Solar PV (RF) (Pty) Ltd proposes the development of the Maidi West Solar PV Cluster with a total generating capacity of up to ~3360MW, comprising three separate solar photovoltaic (PV) facilities and associated infrastructure. Scoping Reports are available for a 30-day review Review period: 03 November 2026 to 04 December 2026 Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak. Kwadisa kgatlhegelo ya gago gore o nne le seabe mo tiragalong e.
Scoping & EIA
Solani Renewables Proprietary (Pty) Ltd proposes the development of the Merafong Hybrid Facility 2, comprising a hybrid renewable energy facility with a contracted generation capacity of up to 175MW and a 600MWh Battery Energy Storage System (BESS). Final Scoping Report has been finalised and submitted to the Department of Forestry, Fisheries and the Environment (DFFE) Register your interest to become involved in the process. Bhalisa umdla wakho wokuthatha inxaxheba kwinkqubo. Registreer u belangstelling om by die proses betrokke te raak. Ngolisa thahasello ea hau ea ho nka karolo ts'ebetsong ena.
Scoping and Environmental Impact Assessment
Mponeng Solar PV (Pty) Ltd (the Applicant) proposes the development of a solar photovoltaic (PV) facility with a generating capacity of up to 140 MW, including a Battery Energy Storage System (BESS) with a capacity of up to 200 MWh, and associated infrastructure (including a 66 kV overhead power line to the Deep Levels South 132 kV Substation). The power generated will be used to supplement Harmony Gold Mining Company Ltd’s energy supply at the Mponeng Gold Mine.
Basic Assessment
NDB PV (Pty) Ltd (the Applicant), a Special Purpose Vehicle (SPV), proposes to develop the Naudesbank Solar Farm, a ground-mounted solar photovoltaic (PV) facility and associated infrastructure intended to support the electricity requirements of the existing Naudesbank mining operation. BA Report is available for a 30-day review. Review period: 06 August 2026 to 07 September 2026 Register your interest to become involved in the process. Bhalisa usho isasasa lakho ukuze ube yingxenye yale nqubo. Registreer u belangstelling om by die proses betrokke te raak.
Basic Assessment
Phakwe Richards Bay Gas Power 3 (Pty) Ltd proposes the construction and operation of grid connection infrastructure consisting of a new 400kV Main Transmission Substation and 4×400kV overhead power lines to connect the authorised 2000MW gas to power facility to the national grid. The Background Information Document, providing details of the project and how to become involved in the process is available for download below. Register your interest to become involved in the process. Bhalisa usho isasasa lakho ukuze ube yingxenye yale nqubo. Registreer u belangstelling om by die proses betrokke te raak.
Scoping & EIA
Phefumula Emoyeni One (Pty) Ltd proposes the construction and operation of grid connection infrastructure to connect the authorised Phefumula Emoyeni One Wind Energy Facility (WEF) (DFFE Ref.: 14/12/16/3/3/2/2696) to the national grid. The proposed grid connection infrastructure is located approximately 16 km north of Ermelo, within the Msukaligwa Local Municipality and Gert Sibande District Municipality, Mpumalanga Province. The Final Scoping Report was submitted to the DFFE for decision.
Basic Assessment
FE Sleeping Giant (Pty) Ltd proposes to develop the Sleeping Giant Main Transmission Substation (MTS) within the authorised FE Kudu Wind Energy Facility development area. The MTS will comprise both a 132kV/400kV and a 400kV/765kV step-up transformer(s) bay(s) to evacuate generated electricity to the authorised Eskom Gamma-Grassridge 765kV power line via a future loop-in-loop-out (LILO) connection. Final Basic Assessment Report submitted to Competent Authority for decision-making
Amendment Process
Cyracraft (Pty) Ltd is proposing amendments to the approved Sol Invictus 1 PV Facility (DFFE Ref.: 14/12/16/3/3/2/873, as amended) and Sol Invictus 2 PV Solar Facility (DFFE Ref.: 14/12/16/3/3/2/869, as amended) and associated infrastructure located southwest of Aggeneys, Nama Khoi Local Municipality, Namakwa District Municipality, Northern Cape Province. Motivation Report is available for a 30-day review period. Review period: 13 November 2026 to 14 December 2026. Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak.
Basic Assessment
ST2 Abangani (Pty) Ltd proposes the development of a solar photovoltaic (PV) facility and associated infrastructure, including battery energy storage systems (BESS) and grid connection infrastructure. The Basic Assessment Report has been finalised and submitted to the Department of Forestry, Fisheries and the Environment (DFFE). Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak. Kwadisa kgatlhegelo ya gago gore o nne le seabe mo tiragalong e.
Amendment
Ummbila Emoyeni Cluster (Pty) Ltd is proposing amendments to the approved Ummbila Emoyeni Four Wind Energy Facility (WEF), with a contracted capacity of up to 140MW, and associated grid connection infrastructure on a site near Morgenzon in the Lekwa Local Municipality within the greater Gert Sibande District Municipality, Mpumalanga. The project forms part of the greater Ummbila Emoyeni WEF authorised under the Department of Forestry, Fisheries and the Environment (DFFE) (Ref. No. 14/12/16/3/3/2/2160). The Revised EMPr and Layout is available for a 30-day review and comment period. Register your interest to become involved in the process.
Amendment Process
Emoyeni Renewable Energy Farm (Pty) Ltd has requested an amendment for the authorised development of the Ummbila Emoyeni Solar PV Facility on a site approximately 6km southeast of Bethal and approximately 1km east of Morgenzon within the Govan Mbeki & Lekwa Local Municipalities, Gert Sibande District Municipality, Mpumalanga. An amendment application for the Final EMPrs and Final Layout approval processes is being undertaken. The Final EMPrs and Final Layout submitted to the DFFE for decision-making
Scoping & EIA
The Applicant, JUWI Renewable Energies (Pty) Ltd, is proposing the construction and operation of a Photovoltaic (PV) Solar Energy Facility and associated infrastructure (also referred to herein as 'the Project'). The facility will have a contracted capacity of up to 480MW and will be known as Vhembe Solar PV and Associated Infrastructure. The power will be evacuated by a Loop-in Loop-out (LILO) connection into the 132 kV Venetia–Njelele overhead line that traverses the project site. The Scoping Report is available for a 30-day review period. Review period: 09 October 2026 to 9 November 2026 Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak. Ngwadiša kgahlego ya gago gore o tšee karolo tshepedišong yeo. Kha vha ṅwalise dzangalelo ḓavho uri vha dzhenele kha maitele.
Scoping and Environmental Impact Assessment
Watt Solar PV (Pty) Ltd (the Applicant) proposes the development of a 45 MW (AC) solar photovoltaic (PV) facility and associated infrastructure near Bapsfontein in the Gauteng Province. Associated infrastructure includes solar PV arrays, modules and mounting structures; inverters and medium-voltage (LV/33 kV) step-up transformers (inverter stations); cabling (DC, low-voltage and 33 kV, typically underground); an on-site 33 kV collector substation; a 33 kV overhead power line and/or underground cable (approximately 2.3 km) to the authorised Watt Solar PV Facility on-site substation; additional 33 kV feeder bay(s) and associated electrical works within the authorised Watt Solar PV Facility on-site substation; temporary and permanent laydown areas, O&M buildings, security infrastructure and fencing around the development area; and site and internal access roads up to 8 m in width where required. The Scoping Report and Appendices will be available for your review from Thursday, 5 November 2026 to Monday, 7 December 2026. The final day to submit comments is Monday, 7 December 2026. Register your interest to become involved in the process. Registreer u belangstelling om by die proses betrokke te raak.
Amendment Process
Genesis Woodhouse Solar 1 (Pty) Ltd and Genesis Woodhouse solar 2 (Pty) Ltd submitted a requests to the Department of Forestry, Fisheries and the Environment (DFFE) to amend the existing Environmental Authorisations for the Woodhouse Solar 1 PV Facility and Woodhouse Solar 2 PV Facility and associated infrastructure, both projects are located on Remaining Extent of Farm Woodhouse 729, near Vryburg, within the Naledi Local Municipality, Dr Ruth Segomotsi Mompati District Municipality, North West Province. The projects are located in the Vryburg REDZ. The Motivation Reports, EMPrs and Final Layouts are available for a 30-day review. Review periods for The Motivation Reports, EMPrs and Final Layouts: 13 November 2026 to 14 December 2026. Register your interest to become involved in the amendment process. Kwadisa kgatlhegelo ya gago gore o nne le seabe mo tiragalong e. Registreer u belangstelling om by die proses betrokke te raak.