Professional Environmental Consulting Services
Savannah Environmental Services
Savannah Environmental Projects
Savannah Environmental provides a holistic environmental management service to public and private sector clients. Current clients include:
  • Eskom Holdings Limited Generation Division
  • Eskom Holdings Limited Transmission Division
  • Department of Water Affairs
  • Department of Environmental Affairs
  • African Clean Energy Developments
  • South African National Roads Agency Limited
  • East Rand Water Care Company
  • Renewable Energy Investments South Africa (Pty) Ltd
  • VentuSA Energy (Pty) Ltd
  • Just Energy
  • Thupela Energy
  • Rainmaker Energy Projects (Pty) Ltd
  • Moyeng Energy (Pty) Ltd
  • BioTherm Energy (Pty) Ltd
  • Windlab Developments South Africa (Pty) Ltd
  • Exxaro Resources Limited
  • Crenersol (Pty) Ltd
Current projects being undertaken by Savannah Environmental include Basic Assessments, Environmental Impact Assessments and environmental compliance monitoring. Documents for public review are available for download below.

In order to view or download the following documents Adobe Acrobat Reader is required.
Select the icon to the left to install the Adobe Acrobat Reader.


Ilanga CSP 9 Near Upington, Northern Cape Province DEA Ref: 14/12/16/3/3/2/90 Emvelo Eco Projects (Pty) Ltd

ILANGA CSP 9 FACILITY AND ASSOCIATED INFRASTRUCTURE WITHIN KAROSHOEK SOLAR VALLEY DEVELOPMENT NEAR UPINGTON, NORTHERN CAPE PROVINCE

Project Names:  

Ilanga CSP 7 Tower Facility and associated infrastructure (DEA Ref:  14/12/16/3/3/2/905); and Ilanga CSP 9 Trough Facility and associated infrastructure (DEA Ref:  14/12/16/3/3/2/904).   This report relates to Ilanga CSP 9.

Applicant:  Emvelo Holdings (Pty) Ltd

Proposed Activity and Location:  The proposed Ilanga CSP 7 Tower Facility and the Ilanga CSP 9 Trough Facility and their associated infrastructure are to be developed as stand-alone projects by Emvelo Holdings (Pty) Ltd and will form part of the Karoshoek Solar Valley Development, located approximately 30 km east of Upington within the //Khara Hais and !Kheis Local Municipalities in the Northern Cape Province.

Ilanga CSP 7 will be developed as a tower plant and will comprise of heliostats and a molten salt tower system with a generation capacity of up to 150MW.  An area of approximately 1 519 ha is required for the development of the facility.  Ilanga CSP 9 will be developed as a trough facility utilising parabolic trough technology with a heat transfer fluid (HTF), and a generation capacity of up to 150MW.  An area of approximately 700 ha is required for this facility. 

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement; Portion 2 of Matjiesrivier 41; Portion 3 of Matjiesrivier 41 and Portion 4 of Trooilaps Pan 53, located approximately 30 km east of Upington within the //Khara Hais and !Kheis Local Municipalities in the Northern Cape.







Back to top of page


info@savannahsa.com




Site designed and hosted by
S2 Web Solutions